首页
登录
职称英语
[originaltext] The need to feed a growing population is putting much pressur
[originaltext] The need to feed a growing population is putting much pressur
游客
2023-07-20
26
管理
问题
The need to feed a growing population is putting much pressure on the world’s supply of water. With 97% of the world’s water too salty to be drunk or used in agriculture, the worldwide supply of water needs careful management, especially in agriculture. Although the idea of a water shortage seems strange to someone fortunate enough to live in a high rainfall country, many of the world’s agricultural industries experience constant water shortages.
Although dams can be built to store water for agricultural use in dry areas and dry seasons, the costs of water redistribution are very high. Not only is there the cost of the engineering itself, but there is also an environmental cost to be considered. Where valleys are flooded to create dams, houses are lost and wildlife homes destroyed. Besides, water may flow easily through pipes to fields, but it cannot be transported from one side of the world to the other. Each country must therefore rely on the management of its own water to supply its farming requirements.
This is particularly troubling for countries with agricultural industries in areas dependent on irrigation. In Texas, farmers’ overuse of irrigation water resulted in a 25% reduction of the water stores. In the Central Valley area of southeastern USA, a huge water engineering project provided water for farming in dry valleys, but much of the water use has been poorly managed.
Saudi Arabia’s attempts to grow wheat in desert areas have been the pumping of huge quantities of irrigation water from underground reserves. Because there is no rainfall in these areas, such reserves can only decrease, and it is believed that fifty years of pumping will see them run dry.
Questions 32 to 35 are based on the passage you have just heard.
32. What is the passage mainly about?
33. What do we learn from the passage?
34. What can be learned from the passage?
35. What is most likely to be discussed next?
选项
A、People in high rainfall countries feel lucky.
B、Much of the world’s water is available for use.
C、The costs of water redistribution should be considered.
D、Water can be easily carried through pipes across the world.
答案
C
解析
选项中的high rainfall,water,available,costs,redistribution等表明,本题考查水的分布、调度等情况。短文中提到,the costs of water redistributionare very high.Not only is there the cost of the engineering itself,but there is also an environmental cost to be considered,即调度水资源的成本非常高,应该引起重视,故答案为[C]。
转载请注明原文地址:https://tihaiku.com/zcyy/2854619.html
相关试题推荐
[originaltext]BenJohnsonwasthenameofthecandidatedefeatedbyGeorge
[originaltext]BenJohnsonwasthenameofthecandidatedefeatedbyGeorge
[originaltext]BenJohnsonwasthenameofthecandidatedefeatedbyGeorge
[originaltext]M:Pardonme,Miss.I’mnewtothisareaandI’mrunninglowong
[originaltext]M:Pardonme,Miss.I’mnewtothisareaandI’mrunninglowong
[originaltext]GateswasbornandbroughtupinSeattle.[29]Attheageof
[originaltext]GateswasbornandbroughtupinSeattle.[29]Attheageof
[originaltext]W:[19]I’msorry,butIcan’tletyoucheckoutthesebooks.M:
[originaltext]W:[19]I’msorry,butIcan’tletyoucheckoutthesebooks.M:
[originaltext]W:So,howarethingsgoing,Steve?M:Well,tobehonest,Carla,
随机试题
Thebeachesarea______forwalking,especiallyintheearlyevening.A、lureB、in
在运输消费者的购买活动中,有的消费者往往以价格作为决定是否购买的决策依据,这类消
u和ü的区别在于()A.嘴唇的圆和不圆 B.舌位的高低不同 C.舌位的前后不
哺乳期最佳断乳时间是( )。A.6个月 B.8个月 C.9个月 D.10
患儿男,3岁,发热,咳嗽两周。实验室检查,WBC6×109/L,血清IgG抗体
建设项目实施的不同阶段包括(),因此业主方项目组织管理机构在项目实施的不同阶段
A.引起水、钠潴留 B.偶致视障碍 C.高铁血红蛋白血症 D.急性中毒可致
有关力的描述不正确的是( )。A.牙齿实际所承受的咀嚼力量 B.与牙周组织关
急进性肾小球肾炎Ⅰ型患者血液浓度常升高的抗体是A.抗肾小球基底膜抗体 B.抗核
下列关于在职培训的说法中,正确的是()。A.正规的在职培训指正式的培训课程项目
最新回复
(
0
)