首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-18
51
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry (or watery mixture) of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to evaporate, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] According to the passage, the term "uranium mine tailings" refers to ______.
选项
A、the uranium that is taken from a mine
B、the ponds that hold liquid radioactive wastes
C、solid wastes that result from the mining of uranium
D、dangerous radon gas that escapes from uranium mines
答案
C
解析
第三段落第四句对这个短语下了定义:Uranium tailings are solid materials in the slurry(or watery mixture) of depleted ore-bearing rock,chemicals,and liquids that result from milling.tailings的词义可以从它的词根判断出来,在这里是指“残渣,废料”。判断词义要注意词根的意思。
转载请注明原文地址:https://tihaiku.com/zcyy/2847885.html
相关试题推荐
[originaltext]Wednesdaysarethemostdepressingdayoftheweek.(30)Ify
In2010,PamelaFink,anemployeeofaConnecticutenergycompany,madeane
In2010,PamelaFink,anemployeeofaConnecticutenergycompany,madeane
In2010,PamelaFink,anemployeeofaConnecticutenergycompany,madeane
In2010,PamelaFink,anemployeeofaConnecticutenergycompany,madeane
[originaltext]WeexperiencedifferentformsoftheSun’senergyeveryday.
[originaltext]WeexperiencedifferentformsoftheSun’senergyeveryday.
Todaypetroleumprovidesaround40%oftheworld’senergyneeds,mostlyfuel
Solarpowerisonekindofcleanenergiesthatareformsofenergywhichdo
Solarpowerisonekindofcleanenergiesthatareformsofenergywhichdo
随机试题
A、3:48-4:37B、7:09-8:20C、8:20-10:00C查看图表第二部分,题中提到的方法,可以获知,需要花8小时20分到10小时的时间。所以
OKimiyukiSudashouldbeaperfectcustomerforJapan’scarmakers.He’sayo
A. B. C. D.
M市第一建筑工程有限公司承建的该市某写字楼大厦项目,该公司将该项目的建筑起重机
某机场的塔台面临一个决策问题:如果荧幕上出现一个小的不规则点,并逐渐接近飞机时,
根据物权法律制度,下列关于土地承包经营权的说法,正确的有( )。A.土地承包经
容易继发胸水、腹水的卵巢良性肿瘤是A.皮样囊肿 B.浆液性囊腺瘤 C.纤维瘤
余某,现年35岁,2004年药学专业大学本科毕业,到某市人民医院药剂科工作。20
波形钢涵洞施工主要工序有()。A.基坑开挖 B.管座基础施工 C.安装拱模
爆破工程施工组织设计应包括的内容为( )。A.施工组织机构及职责 B.施工准
最新回复
(
0
)