Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.( ) is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.A.Cost-Benefit analysis B.Control charts C.Quality function deploymentD.Cost of quality analysis
选项
A.Cost-Benefit analysis
B.Control charts
C.Quality function deployment
D.Cost of quality analysis
答案
D
解析
转载请注明原文地址:https://tihaiku.com/congyezige/2299721.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Theproject()processesinclude:dev
()includestheprocessforincorporat
Qualitymanagementensuresthatanorgan
Thesevenbasicqualitytoolsareusedw
PlanQualityistheprocessofidentifyi
PerformQualityControlistheprocesso
()istheprocessofidentifyingindivi
Validatescopeistheprocessofformali
()isoneofthequalityplanningoutputs
()istheoutputofthequalityplannin
随机试题
TheMostBeautifulCityinAmericaIthasbeencalledthemos
Thousandsofschoolchildrenarehavingtheireducationdecidedbya"rollof
南方地区的某节制闸工程,发包人与承包人依据《标准设计施工总承包招标文件(2012
旅行社组织接待入境旅游,发现有非法滞留却未能履行报告义务的,由公安机关对其依法追
运行中的组合电器应具有齐全的()。A.安装投运文件B.检修技术文件C
根据税收征收管理法律制度的规定,下列关于纳税申报方式的表述中,不正确的是()。A
西南地区某高速公路于2009年完成环评审批,2013年建成试运行,现拟开展竣工环
某装饰企业施工的M项目于2019年10月工程完工时共发生材料费30万元,项目管理
单价分析前,应首先计算出工程中拟使用的人工、材料、施工机械的( )。 A.基
最新回复
(
0
)