If the approved change requests have an
If the approved change requests have an
练习题库
2022-08-02
49
问题
If the approved change requests have an effect on the project scope,then the corresponding component documents and cost baselines,and( )of the project management plan are revised and reissued to reflect the approved changes.A.developing baselines B.testing baselines C.schedule base lines D.ending baselines
选项
A.developing baselines
B.testing baselines
C.schedule base lines
D.ending baselines
答案
C
解析
如果批准的变更请求对项目范围的影响,那么相应的组件文件和成本基线,和进度基线的项目管理计划。修订再版反映批准的变更。(75) A.发展基线 B.测试基线 C.进度基线 D.结束基线
转载请注明原文地址:https://tihaiku.com/congyezige/2296001.html
本试题收录于:
高级信息系统项目管理师题库软件水平考试初中高级分类
高级信息系统项目管理师
软件水平考试初中高级
相关试题推荐
( )istheapprovedversionofthetime-
ThePerformIntegratedChangeControlpr
hePerformIntegratedChangeControlpro
ThePerformIntegratedChangeControl
ThePerformIntegratedChangeControl
TheperformIntegratedChangeContorlpr
Iftheapprovedchangerequestshavean
Changesmayberequestedbyanystakehol
Iftheapprovedchangerequestshavean
Changesmayberequestedbyanystakehol
随机试题
A—Threegoldmedalsinone"Dynasty"—TheSino-FrenchJointVentureWineryLtd.B
[originaltext]W:Hasyourbrotherfoundanapartmentyet?M:No,he’sstillliv
下列选项中,负责面向学员进行相关BIM软件培训的是()A.BIM高校讲师 B.
黄色泡沫状脓性白带常见于A.卵巢颗粒细胞瘤B.霉菌性阴道炎C.滴虫性阴道炎D.老
患者,女,39岁,发现皮肤黄色斑块10年,胸闷2年,反复发作胸痛1年。心电图检查
医院和疗养院主要检查的内容有()。A.设置层数 B.相邻护理单元间的防火分隔
某企业家慷慨从事慈善捐助,但为了带动和影响周围更多的人,他每次捐助时,都大张旗鼓
①张库商道南承京津,辐射湖广,北而一直延伸至俄国恰克图,影响直达欧洲 ②张家口
小学生合理膳食的安排最好是( )。A.早餐和午餐应为富含蛋白质和脂肪食物 B
下列关于施工成本分析的说法正确的是()。A.会计核算主要是成本核算 B.业务核
最新回复
(
0
)