首页
登录
职称英语
Given the persistent and intransigent nature of the American race system, which
Given the persistent and intransigent nature of the American race system, which
游客
2025-04-18
32
管理
问题
Given the persistent and intransigent nature of the American race system, which proved quite
impervious
to black attacks, Du Bois in his speeches and writings moved from one proposed solution to another and the salience of various parts of his philosophy changed as his perceptions of the needs and strategies of black American shifted over time.
选项
A、vigilant
B、inadvertent
C、impenetrable
D、incongruous
答案
C
解析
impervious意为“无动于衷的,不受影响的”。C选项:impenetrable意为“不能穿过的,不可理解的”,与画线的单词意义相符,如:The language of this documentwould be impenetrable to anyone except a specialist.(除了专家,其他任何人都看不懂这份文件。)根据句意:鉴于美国种族制度的持续性和顽固性,该制度证明是完全不受黑人抨击的影响的……。故选C。其他三项:vigilant警惕的;警觉的;inadvertent粗心大意的;incongruous不协调的,不和谐的。
转载请注明原文地址:http://tihaiku.com/zcyy/4043640.html
相关试题推荐
ThefearofAmericanizationoftheplanetismoreideologicalparanoia(多疑)
ThehistoryofAfrican—Americansduringthepast4-00yearsistraditionally
ThehistoryofAfrican—Americansduringthepast4-00yearsistraditionally
ThehistoryofAfrican—Americansduringthepast4-00yearsistraditionally
ThehistoryofAfrican—Americansduringthepast4-00yearsistraditionally
ThehistoryofAfrican—Americansduringthepast4-00yearsistraditionally
ThehistoryofAfrican—Americansduringthepast4-00yearsistraditionally
ThehistoryofAfrican—Americansduringthepast4-00yearsistraditionally
ThehistoryofAfrican—Americansduringthepast4-00yearsistraditionally
ThehistoryofAfrican—Americansduringthepast4-00yearsistraditionally
随机试题
Mr.Greyhastwosons,______arefamousdancers.A、boththeyB、bothofthemC、th
【B1】[br]【B4】A、possessedB、ownedC、endowedD、grantedC本题考查的是对动词词组的词义辨析。应该看出本题是被
关于水喷雾系统的雨淋阀的下列说法中不正确的是()。A.角式雨淋阀利用隔膜的
在双代号网络计划中,当计划工期等于计算工期时,关键线路上的工作一定是()。A
()是网络的心脏,它提供了网络最基本的核心功能,如网络文件系统、存储器的管理
证券公司、证券投资咨询机构应当对证券投资顾问的业务推广、( )等环节实行留痕管
关于船名的约定,通常有两种约定方法,即指名船舶和(?)。A.指示船舶 B.代替
已知如图,直角三角形ABC的两直角边AC=8厘米,BC=6厘米,以AC、BC
对进口误卸、溢卸、放弃及超期未报货物,海关均可依法变卖处理,但前提条件各不一样.
施工单位认为,有关环境影响问题应由建设单位负责,矿井有环保相关设施,关于废石排放
最新回复
(
0
)