首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-02-06
30
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] The word "evaporate"(Line 7, Para. 3)means_____.
选项
A、steam
B、strengthen
C、flow out
D、harden
答案
A
解析
词汇题。根据上下文来推测词义。根据the ponds are left to evaporate,uncovering piles of dried tailings可判断出由于池塘里的液体蒸发没有了,废料才露了出来。故选项A正确。
转载请注明原文地址:http://tihaiku.com/zcyy/3428118.html
相关试题推荐
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
随机试题
Youprobablyknowthatit’sbetterforbothyouandtheenvironmentifyoub
Whatattractscustomers?Obviouslythequalityofaproductdoes,butvisual
SexisminEnglishSexisminEnglishlanguagereflectsthetraditionalethicstha
TheHealthBenefitsofDrinkingWater—IsBottl
根据处理医嘱的原则,应首先执行A.即刻医嘱 B.定时执行的医嘱 C.新开出的
某机电安装公司承包了一个炼油厂装置的安装工程,该安装工程内容包括:设备安装、管道
某单跨仓库,如图所示。跨度15m,开间6m,共6个开间,属刚弹性方案。窗高3.6
甲公司欠乙公司50万贷款,不就甲公司被乙公司收购,致债权债务关系消灭,该债务关
甲公司进行脱硝系统氨区改造,委托乙公司拆除原有液氨储罐及相关管路。为保证作业人员
建设工程施工劳务合同中,由劳务分包人负责办理,并支付保险费用的是()。A.工程承
最新回复
(
0
)